55095696
TIME RELAY
The 550 956 96 RELAY, TIME is a critical electrical component that manages timed sequences on your rig. It ensures operations like rod changes or lubrication cycles happen precisely when needed, preventing operational hiccups and keeping your drilling process smooth and predictable.
Description
550 956 96 RELAY, TIME this little guy is basically the brains behind certain timed operations on the rig. It’s not just a simple on/off switch; it holds a signal for a set duration or waits before letting another circuit fire. Think about things…
Full Technical Description
550 956 96 RELAY, TIME this little guy is basically the brains behind certain timed operations on the rig. It’s not just a simple on/off switch; it holds a signal for a set duration or waits before letting another circuit fire. Think about things like drill rod changes, where you need a cylinder to extend, pause, then retract, or maybe a lubrication cycle that needs to run for X seconds after a pump kicks in. It makes sure things happen in the right order and at the right pace, preventing components from crashing into each other or processes from starting too early.
When one of these time relays starts to go south, you’ll usually notice things getting a bit… off. Maybe a sequence that used to be smooth now hesitates, or a component moves before it should, or even worse, it doesn't move at all when it's supposed to. I’ve seen rigs where the drill feed would stutter or the rod changer would get out of sync because a TIME RELAY wasn't holding its signal consistently. It can be tricky to pinpoint because it often looks like a hydraulic or mechanical issue, but if your timing is inconsistent, check the electrical side, especially these relays.
Replacing one of these isn't usually a huge job, but you gotta make sure you're putting in the right one with the correct delay settings if it's adjustable. Before you even swap it out, double-check the wiring connections; sometimes it's just a loose terminal causing intermittent issues, not the relay itself. And always, always verify the power supply to the relay – a voltage drop can make it act up just as bad as an internal fault. Don't forget to cycle the system a few times after replacement to confirm the timing is back to spec.
Applications
- Underground drilling jumbos
- Mining and tunneling
- Hydraulic control systems
- Rock drilling spare parts
Specifications
| Brand | Sandvik |
|---|---|
| Machine Type | DX700 |
| Assembly | INSTRUMENT BOX ASSEMBLY |
Brand
All Sandvik partsCustomer Reviews
No reviews yet.
Reviews come from verified buyers: customers whose quotation for this part was accepted.
How to get TIME RELAY 55095696
Jumbosan supplies TIME RELAY 55095696. Choose the way that suits you.
Send a quote request form
Fill in the short form with the quantity and your company details. We reply with availability and lead time.
Contact us by email
Email [email protected] with the part number and the quantity you need.
Message us on WhatsApp
Send the part number to +90 543 279 89 81 on WhatsApp and a salesperson replies in the chat.
Send your list to the AI quote page
Upload a PDF, photo or spreadsheet of part numbers. The AI reads it and builds the request for you, which suits long lists.








