55095696a
RELAY, TIME
The 550 956 96A RELAY, TIME is a critical electrical timer on your rig, managing the precise sequencing of operations. It ensures components activate in the correct order, preventing sudden jolts and maintaining smooth cycle transitions. If functions are delayed or inconsistent, this relay might be the culprit.
Description
550 956 96A RELAY, TIME this little guy is essentially a timer in the electrical system. It's not just a simple on/off switch; it holds things back for a set period. Think about it like this: when you hit a button, it doesn't immediately send power…
Full Technical Description
550 956 96A RELAY, TIME this little guy is essentially a timer in the electrical system. It's not just a simple on/off switch; it holds things back for a set period. Think about it like this: when you hit a button, it doesn't immediately send power to whatever it's controlling. Instead, it waits, maybe a few seconds, sometimes longer, before making the connection or breaking it. This is crucial for sequencing operations on the rig, like making sure a hydraulic pump gets up to speed before a cylinder tries to move, or giving a motor a soft start. It prevents sudden jolts and ensures things happen in the right order, which is pretty important when you've got a lot of heavy iron moving around.
When one of these starts acting up, you’ll usually notice some weird timing issues. Maybe a function that's supposed to kick in after a few seconds either fires instantly or just never comes on at all. Or it might be intermittent – works fine for a bit, then suddenly delays too long, or cuts out prematurely. I’ve seen rigs where the feed system would get sluggish or even hesitate because the relay controlling a sequence wasn't holding its timing. It's not always a hard failure; sometimes they just get 'sticky' internally, and the delay becomes inconsistent. That's when you start chasing your tail, wondering why a certain cycle isn't completing smoothly.
Replacing these isn't usually a big deal, electrically speaking. Just make sure you've got the power off, obviously, and double-check your wiring before you pull the old one out. What a lot of guys forget, or sometimes overlook, is to confirm the new relay is set to the *correct time delay* before installation. They often come with adjustable settings, and if you just slap it in without verifying, you'll still have the same timing problem, or worse, create a new one. Always confirm the dip switch or potentiometer settings match what the schematic calls for, or what the old one was set to. It's a quick check that saves a lot of head-scratching later.
Applications
- Underground drilling jumbos
- Mining and tunneling
- Hydraulic control systems
- Rock drilling spare parts
Specifications
| Brand | Sandvik |
|---|---|
| Machine Type | DL421-15C |
| Assembly | CONTROL BOX ASSEMBLY |
Customer Reviews
No reviews yet.
Reviews come from verified buyers: customers whose quotation for this part was accepted.
OEM & Aftermarket
Compatible parts for major brands
Global shipping
Delivering to 50+ countries
Need help?
Contact our team for support







